City Index

We installed a large communications suite, with UPS backup and to ensure a positive look for customers visiting the office we designed and fitted and new lighting scheme throughout both floors, including the customer-facing meeting rooms.

The project ran for 16 weeks and was completed on time, and the client was very pleased with the outcome.

Location Size:2,500m²
Building Type: 2 Floor Office
Industry Type: Finance

Scope of works

Design, Supply and Installation of the following:

  • Site Temporary Power

  • Lighting Installation Works

  • Emergency Lighting Installation

  • Small Power Installation

  • Comms Room Power

  • Sub-Main Power Distribution

  • Uninterrupted Power Supply

  • Fire Alarms

  • Air Conditioning Power Supply

  • Intelligent Lighting Control System